You are working on a project schedule. You need two tasks to end at the same time so that your review team can do their work on both tasks. Which link type is appropriate?





βœ… Correct Answer: 4

What does the Resource View display?





βœ… Correct Answer: 3

What does PERT stand for?





βœ… Correct Answer: 3

How does Microsoft Project calculate work?





βœ… Correct Answer: 4

The ______ tab on the ribbon allows you to customize text, columns, colors, and other elements of each type of view.





βœ… Correct Answer: 3

Which of the following is NOT a valid duration measurement for a task?





βœ… Correct Answer: 4

A project template has this file extension:





βœ… Correct Answer: 1

MS project is NOT interoperable with:





βœ… Correct Answer: 2

What is a successor activity?





βœ… Correct Answer: 1

A _________ is a deliverable oriented decomposition of a project into smaller components.





βœ… Correct Answer: 3

How many nested levels of sort criteria are available in the Sort dialog box?





βœ… Correct Answer: 3

A resource can be created by:





βœ… Correct Answer: 4

Which of the following is a valid task link type?





βœ… Correct Answer: 4

What is a milestone?





βœ… Correct Answer: 3

______ is any deviation from the baseline of a project.





βœ… Correct Answer: 3

___ are scheduled events that indicate the completion of a major deliverable.





βœ… Correct Answer: 1

By default, Duration is measured in:





βœ… Correct Answer: 2

What is a run chart?





βœ… Correct Answer: 2

Which of the following is NOT a standard field contained within a project?





βœ… Correct Answer: 3

What is the default duration assigned to an automatically scheduled task?





βœ… Correct Answer: 1

What is the default unit of time by which Lag Time is measured?





βœ… Correct Answer: 4

FS dependency implies?





βœ… Correct Answer: 2

How do you mark or indicate a task is a subtask of another?





βœ… Correct Answer: 3

___ is a delay between two tasks that are linked by a dependency.





βœ… Correct Answer: 3

The _______ is the longest duration of linked tasks in a project which must be completed on time for the project to complete on time.





βœ… Correct Answer: 1

FF dependency implies?





βœ… Correct Answer: 3

Payback period is the time it takes to pay back what a project costs. For a project that costs $5,000,000 and delivers increased revenue of $500,000/month, how do you calcuate payback period?





βœ… Correct Answer: 2

The ______ view, automatically displayed above other views, shows a concise overview of the entire schedule.





βœ… Correct Answer: 2

What does PMI stand for?





βœ… Correct Answer: 4

___ scheduling starts at the end of the project and works backwards through the project tasks to the present.





βœ… Correct Answer: 2

Which of the following is NOT a valid import type for tasks?





βœ… Correct Answer: 3

The __________ is the approved project schedule and issued to determine the variation between the plan and actual.





βœ… Correct Answer: 3

You are the project manager on the installation of a new ERP system. Before the system can be installed on the company's servers, the operating system must be upgraded. This is an example of what type of precedence relationship?





βœ… Correct Answer: 1

How does Microsoft Project calculate the total work time of a summary task?





βœ… Correct Answer: 1

Breaking a project into phases and then further dividing into summary tasks and subtasks is called _________ scheduling.





βœ… Correct Answer: 4

How will a task appear on the Gantt chart when it is a successor of another task?





βœ… Correct Answer: 1

What is the best way of doing resource loading in a project having lot of dependencies?





βœ… Correct Answer: 2

How can you change the duration on a summary task?





βœ… Correct Answer: 1

Putting 9FF3 in the predecessor column of task 10 causes which of the following to happen?





βœ… Correct Answer: 4

A _______ is a chart with a series of horizontal lines showing the amount of work done in certain periods of time in relation to the amount of work planned for those periods.





βœ… Correct Answer: 2

Use the _____ feature to resolve resource conflicts and over-allocations.





βœ… Correct Answer: 4

Press the ____ key to display KeyTips over each feature.





βœ… Correct Answer: 2

What is a Gantt chart?





βœ… Correct Answer: 1

What does WBS stand for?





βœ… Correct Answer: 2

The formula to calculate Cost Variance is:





βœ… Correct Answer: 4

Which of the following is NOT a constraint type?





βœ… Correct Answer: 4

The ________ new feature in Microsoft Project 2013 allows you to select any task and see the complete chain of predecessors and successors linked to it.





βœ… Correct Answer: 2

What does leveling refer to?





βœ… Correct Answer: 2

_______ is the length of time by which a task is ahead of schedule and will be completed early if continued.





βœ… Correct Answer: 1

What character follows an estimated duration?





βœ… Correct Answer: 1