Choose a topic to test your knowledge and improve your Mathematics skills
If a = 2b 3b=4c and 5c=6a-7 what is the value of c?
If 3212=4a-3 what is the value of a?
If 2y-5x=5 what is the smallest integral value of x for which y>100?
If a-8 = 10 - 2a then a = ?
If p-11 -2p=13-5p then p=?
If x/2+x/3=1/2+1/3 then x = ?
If 3x+y=10 and x+y=6 then x = ?
If 2x+y=10 and x+y=7 then y = ?
If x2+3x+2 = 0 then which of the following are possible values of x? I- 1 II- (-1) III- (-2)
If 0 < a < b < 1 which of the following is (are) true I- a-b is negative II- 1/ab is positive III- 1/b-1/a is positive
If x and y are negative and z is positive which of the following is (are) true I- x-y<="" y="" iii-="" 1="" z<="" td="">
If x<="" td="">
p<q<="" td=""></q
If x>y>z which of the following cannot be true.
If -7<a<y<="" td=""></a
In the above question what is the minimum integral value of y+x.
If a ? -b (a2-b2)/(a-b) = 40 then a+b =
If n = 4 and m = 7 then 1/n + 1/nm
21d2 - 7d + 8 - 4d (2d-3) =
(x+4)(x-5) = 10 then x is?
(a10-c2)2 - (a10+c2)2 =
If 1 ? -m then (12-m2)/(1+m) = 23 then 1-m =
If x2 -16<0 which of the following must be true.
If y2-25<0 which of the following cannot be true.
7x2-4x+4-9x(2x-3)
If L#N then (LM-LN)/(N-M)=
Which of the following is equivalent to 9x2-6x-3
(x4+y)2+(x4-y)2=
If 1 = m + mt2 then t =
The binomial x2-30 is exactly divisible by
If x is an even integer and 4x < 64 and 3x > 24 then x can be equal to
If a<b<c<="" td=""></b<c
If 6x = 2y = 3z then 9x + 5y =
If m > 1 and mn + 3 = 3-n then n =
If r ? -s and a = (r-s) / (r+s) +1 then a + 1=
If x = 2 and y = 3 then (1 / x + 1 / y) / (xy) =
If x > 1 and a / b = 1 - 1 / x then b/a =
Which of the following is equivalent to : 3x2 + 18x + 27
If an inlet pipe fills a tank in 10 hrs then part of tank filled in 1 hr.
If part of tank filled in one hour = 1/10 then time required to fill the tank.
If an inlet pipe fills a tank in 10 hrs and another inlet pipe fills the same tank in 5 hrs then time required to fill the tank when both pipes are opened.
If an outlet pipe empties a full tank in 20 hrs then part of tank emptied in one hour.
An inlet pipe can fill a tank in 10 hrs and an outlet pipe empties the same full tank in 20 hrs. The time required to fill the tank when both pipes are opened.
If A can do a piece of work in 10 days then part of work done by him in one day.
If As 1 days work = 1/20 then time required to finish the job (in days)
If A can do a job in 10 days another person B can do the same job in 20 days then time required to do the job when both of them working todether.
Alia can complete an assignment in 5 days and Babar can complete the same assignment is 20 days. The time taken by both Alia and Babar to complete the assignment working together is
Asghar can do a job in 60 days. And both Asghar and Babar can do the same job in 20 days working together. Babar alonge can do the some job in
X can do a job in 16 days Y can do the same job in 20 days X Y and Z can do the job in 7.5 days. Alone Z can do the same job in
Ahmar works twice as fast as Bina. If Bina can complete a work in 30 days the number of days taken by Ahmar and Bina to complete the work working together is